Skip to content

cffi: update to use libyang v4.2.2 #603

cffi: update to use libyang v4.2.2

cffi: update to use libyang v4.2.2 #603

Triggered via pull request November 11, 2025 12:35
Status Failure
Total duration 44s
Artifacts

ci.yml

on: pull_request
Matrix: test
check-commits
12s
check-commits
coverage
37s
coverage
Fit to window
Zoom out
Zoom in

Annotations

13 errors
test (3.11, py311)
Process completed with exit code 1.
lint
Process completed with exit code 1.
test (3.9, py39)
The strategy configuration was canceled because "test._3_11_py311" failed
test (3.9, py39)
The operation was canceled.
test (3.13, py313)
The strategy configuration was canceled because "test._3_11_py311" failed
test (3.13, py313)
The operation was canceled.
test (3.10, py310)
The strategy configuration was canceled because "test._3_11_py311" failed
test (3.10, py310)
The operation was canceled.
test (3.12, py312)
The strategy configuration was canceled because "test._3_11_py311" failed
test (3.12, py312)
The operation was canceled.
coverage
Process completed with exit code 1.
test (pypy3.9, pypy3)
The strategy configuration was canceled because "test._3_11_py311" failed
test (pypy3.9, pypy3)
The operation was canceled.