Skip to content

cffi: update to use libyang v4.2.2 #611

cffi: update to use libyang v4.2.2

cffi: update to use libyang v4.2.2 #611

Re-run triggered January 5, 2026 15:47
Status Failure
Total duration 1m 7s
Artifacts

ci.yml

on: pull_request
Matrix: test
check-commits
8s
check-commits
coverage
33s
coverage
Fit to window
Zoom out
Zoom in

Annotations

12 errors
test (3.12, py312)
Process completed with exit code 1.
coverage
Process completed with exit code 1.
test (3.10, py310)
The strategy configuration was canceled because "test._3_12_py312" failed
test (3.10, py310)
Process completed with exit code 1.
test (3.11, py311)
The strategy configuration was canceled because "test._3_12_py312" failed
test (3.11, py311)
Process completed with exit code 1.
test (3.9, py39)
The strategy configuration was canceled because "test._3_12_py312" failed
test (3.9, py39)
Process completed with exit code 1.
test (3.13, py313)
The strategy configuration was canceled because "test._3_12_py312" failed
test (3.13, py313)
The operation was canceled.
test (pypy3.9, pypy3)
The strategy configuration was canceled because "test._3_12_py312" failed
test (pypy3.9, pypy3)
The operation was canceled.