-
Notifications
You must be signed in to change notification settings - Fork 9
Description
For the PM Presentation, could we get the option to generate Graphs for the following things
Change Requests based on Status (specifically approved vs rejected)
Change Requests per Specific Project(s)
Budget Used vs Leftover in Total and for Specific Project(s)
Also could we get a snapshot of the original timelines/Gantt Chart from July (already asked Peyton about this one). Potentially also overlayed over the current/updated timeline?
https://nu-electric-racing.slack.com/archives/C02U5TKHLER/p1743972171380669
from old recruitment metrics inquiry:
THIS REQUIRES MORE DISCOVERY WITH OPERATIONS
Start now so the data becomes relevant (probably within 3 semesters)
Calculate attrition and retention for each team
Problem is that people leave and come back, switch teams, etc etc, the problem is that this is just so fluid so it’s nearly impossible to keep track by subteam, so maybe this should be organized by software, engineering, operations
Understand which kind of impressions work best (club day, posters, etc)
This should probably be its own software entirely -> just a simple MySQL server lolz
Ideally should be done before Fall 2023 starts
Metadata
Metadata
Assignees
Labels
Type
Projects
Status