Skip to content

Hydropower lifetime restrictions- infeasibility #136

@n7gonzalez

Description

@n7gonzalez

As of now, the simple hydropower module enforces historical flow rates. However, if a shorter lifetime is used (say 100 years rather than 200), leading some capacity to retire before 2050 or whatever the future investment period is, then there will not be enough installed capacity to meet historical hydro flows and the model becomes infeasible. We need to add a way to adjust historical flows as a factor of installed capacity.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions